1 00:00:03,180 --> 00:00:02,690 [Music] 2 00:00:06,770 --> 00:00:03,190 [Applause] 3 00:00:10,000 --> 00:00:06,780 [Music] 4 00:00:15,880 --> 00:00:10,010 [Applause] 5 00:00:20,420 --> 00:00:17,260 [Music] 6 00:00:22,340 --> 00:00:20,430 7:5 quarterly film report number 13 7 00:00:25,960 --> 00:00:22,350 covers progress during the period 8 00:00:30,800 --> 00:00:25,970 December 1st 1965 through February 28 9 00:00:33,290 --> 00:00:30,810 1966 development manufacturing and 10 00:00:34,930 --> 00:00:33,300 testing of s1c stages by the Boeing 11 00:00:42,380 --> 00:00:34,940 Company and the Marshall Center 12 00:00:45,049 --> 00:00:42,390 continued throughout the quarter the 13 00:00:47,360 --> 00:00:45,059 final flowering of the s1c static test 14 00:00:49,940 --> 00:00:47,370 stage was conducted at Marshall on 15 00:00:53,150 --> 00:00:49,950 December 16th this brought the total 16 00:00:58,010 --> 00:00:53,160 number of tests to 15 for a total firing 17 00:01:00,380 --> 00:00:58,020 time of nearly 15 minutes mission 18 00:01:02,569 --> 00:01:00,390 successfully accomplished the stage was 19 00:01:05,149 --> 00:01:02,579 removed from the static test stand On 20 00:01:08,030 --> 00:01:05,159 January 20th and transferred to the 21 00:01:09,679 --> 00:01:08,040 manufacturing area for refurbishment it 22 00:01:11,870 --> 00:01:09,689 will be shipped to Marshalls Mississippi 23 00:01:16,090 --> 00:01:11,880 test facility in November for the 24 00:01:19,280 --> 00:01:16,100 initial firing in MTFs new s1 ceased and 25 00:01:21,890 --> 00:01:19,290 the first s 1c flight stage completed 26 00:01:23,960 --> 00:01:21,900 its post manufacturing checkout and was 27 00:01:27,679 --> 00:01:23,970 moved to Marshalls test lab On January 28 00:01:29,050 --> 00:01:27,689 24th the same date on which the second 29 00:01:31,580 --> 00:01:29,060 flight stage was transferred from 30 00:01:35,510 --> 00:01:31,590 manufacturing engineering lab to quality 31 00:01:37,310 --> 00:01:35,520 lab to begin its checkout the first 32 00:01:39,590 --> 00:01:37,320 flight stage was then installed in the 33 00:01:42,740 --> 00:01:39,600 static test stand replacing the static 34 00:01:44,300 --> 00:01:42,750 test stage following LOX load tests and 35 00:01:46,910 --> 00:01:44,310 final preparation for firing 36 00:01:48,710 --> 00:01:46,920 the stage underwent the first of two 37 00:01:51,710 --> 00:01:48,720 acceptance stepping firing tests On 38 00:01:54,050 --> 00:01:51,720 February 17th it's five f-1 engines 39 00:01:57,109 --> 00:01:54,060 producing seven and 1/2 million pounds 40 00:01:59,270 --> 00:01:57,119 of thrust the Boosters initial firing 40 41 00:02:02,450 --> 00:01:59,280 seconds in duration was completely 42 00:02:05,600 --> 00:02:02,460 successful On February 25th the second 43 00:02:08,270 --> 00:02:05,610 firing was conducted scheduled for 125 44 00:02:10,010 --> 00:02:08,280 seconds it was cut off at 83 seconds 45 00:02:11,370 --> 00:02:10,020 when a failure of engine number one 46 00:02:14,400 --> 00:02:11,380 chamber pressure trends 47 00:02:16,770 --> 00:02:14,410 users occurred however review a post 48 00:02:19,590 --> 00:02:16,780 firing data indicated no serious 49 00:02:22,110 --> 00:02:19,600 irregularity and no further static tests 50 00:02:29,480 --> 00:02:22,120 are necessary after refurbishment the 51 00:02:34,260 --> 00:02:32,070 post manufacturing checkout of the 52 00:02:36,450 --> 00:02:34,270 second flight stage is due to be 53 00:02:38,250 --> 00:02:36,460 finished early next quarter following 54 00:02:41,880 --> 00:02:38,260 which the stage will be moved to the 55 00:02:43,620 --> 00:02:41,890 static stand for firing at Marshalls 56 00:02:46,020 --> 00:02:43,630 Michou assembly facility in New Orleans 57 00:02:48,480 --> 00:02:46,030 post manufacturing checkout of the 58 00:02:52,830 --> 00:02:48,490 facilities checkout stage ended in early 59 00:02:54,960 --> 00:02:52,840 January the stage was weighed prepared 60 00:02:57,420 --> 00:02:54,970 for shipment and transported to the 61 00:03:00,750 --> 00:02:57,430 barge Poseidon which left on January 15 62 00:03:04,950 --> 00:03:00,760 for KSC the booster will be used there 63 00:03:07,110 --> 00:03:04,960 in checkout of launch complex 39 the 64 00:03:10,290 --> 00:03:07,120 first f1 engine for the third flight 65 00:03:12,690 --> 00:03:10,300 stage was installed on January 21st all 66 00:03:15,210 --> 00:03:12,700 five engines had been mounted by the end 67 00:03:16,920 --> 00:03:15,220 of February the booster will be moved to 68 00:03:20,760 --> 00:03:16,930 the stage test building for post 69 00:03:22,620 --> 00:03:20,770 manufacturing checkout in March the 70 00:03:26,670 --> 00:03:22,630 fourth flight stage is nearing the final 71 00:03:28,800 --> 00:03:26,680 phase of assembly at Michou fabrication 72 00:03:31,140 --> 00:03:28,810 and assembly were in progress on the 73 00:03:34,980 --> 00:03:31,150 stages thrust structure fuel tank and 74 00:03:37,170 --> 00:03:34,990 inner tank work commenced in December on 75 00:03:39,090 --> 00:03:37,180 the sixth flight stage with installation 76 00:03:43,080 --> 00:03:39,100 of z stiffeners for the center engine 77 00:03:51,750 --> 00:03:43,090 support Assembly of Y rings for the 78 00:03:56,230 --> 00:03:54,640 the first cluster firing of the s2 79 00:03:58,570 --> 00:03:56,240 battleship stage using flight 80 00:04:00,370 --> 00:03:58,580 configuration j2 engines was 81 00:04:03,310 --> 00:04:00,380 successfully accomplished on December 82 00:04:06,280 --> 00:04:03,320 29th at North American Aviation's Santa 83 00:04:08,110 --> 00:04:06,290 Susana California field laboratory the 84 00:04:11,200 --> 00:04:08,120 initial static test was for nineteen 85 00:04:13,300 --> 00:04:11,210 seconds as scheduled on January 12 the 86 00:04:16,960 --> 00:04:13,310 first world duration pairing was held 87 00:04:18,720 --> 00:04:16,970 during the 354 second test the engine 88 00:04:21,790 --> 00:04:18,730 gimbal in system was successfully 89 00:04:24,100 --> 00:04:21,800 operated another objective was to check 90 00:04:26,380 --> 00:04:24,110 out the stages liquid oxygen cutoff 91 00:04:28,900 --> 00:04:26,390 system which terminates propellant flow 92 00:04:31,540 --> 00:04:28,910 when the LOX reaches a preset level a 93 00:04:38,500 --> 00:04:31,550 second for duration firing was held 94 00:04:41,050 --> 00:04:38,510 February 22nd the facility's checkout 95 00:04:43,780 --> 00:04:41,060 stage was completed on February 18th by 96 00:04:45,700 --> 00:04:43,790 the s2 prime contractor north american 97 00:04:48,180 --> 00:04:45,710 space and information systems division 98 00:04:50,860 --> 00:04:48,190 at its seal Beach California facility 99 00:04:52,810 --> 00:04:50,870 following preparations for shipping the 100 00:04:55,390 --> 00:04:52,820 stage was loaded aboard the point Barrow 101 00:04:58,990 --> 00:04:55,400 and ocean-going vessel enroute for the 102 00:05:00,850 --> 00:04:59,000 Kennedy Space Center final assembly of 103 00:05:02,410 --> 00:05:00,860 the first flight stage was underway 104 00:05:06,250 --> 00:05:02,420 during the quarter in the vertical 105 00:05:08,650 --> 00:05:06,260 Assembly Building at sea or beach in 106 00:05:10,720 --> 00:05:08,660 January the stage was transferred to the 107 00:05:13,420 --> 00:05:10,730 hydrostatic test station for a numerous 108 00:05:16,060 --> 00:05:13,430 static testing upon completion the stage 109 00:05:18,100 --> 00:05:16,070 was returned to the assembly area for 110 00:05:20,170 --> 00:05:18,110 systems installation and installation 111 00:05:22,300 --> 00:05:20,180 closeout to be followed by mounting of 112 00:05:25,030 --> 00:05:22,310 engines and completion of mechanical and 113 00:05:28,480 --> 00:05:25,040 electrical installations scheduled next 114 00:05:30,130 --> 00:05:28,490 quarter fabrication of structural 115 00:05:32,440 --> 00:05:30,140 components and assembly of major 116 00:05:34,990 --> 00:05:32,450 structural sub assemblies for the second 117 00:05:37,900 --> 00:05:35,000 third and fourth flight stages continued 118 00:05:40,210 --> 00:05:37,910 parts such as these s2 skirts are 119 00:05:44,110 --> 00:05:40,220 manufactured at essent ids tulsa 120 00:05:46,480 --> 00:05:44,120 oklahoma plant double seal cryogenic 121 00:05:48,580 --> 00:05:46,490 sidewall insulation for s2 liquid 122 00:05:52,570 --> 00:05:48,590 hydrogen tanks is also produced at the 123 00:05:55,030 --> 00:05:52,580 tulsa facility items of ground support 124 00:05:57,190 --> 00:05:55,040 equipment manufactured at tulsa include 125 00:06:01,390 --> 00:05:57,200 these tanks servicing mechanisms and 126 00:06:04,240 --> 00:06:01,400 tank pressurization control units other 127 00:06:04,890 --> 00:06:04,250 GSE is produced at Essen tidies Compton 128 00:06:07,620 --> 00:06:04,900 California 129 00:06:09,719 --> 00:06:07,630 facility typical of work done there is 130 00:06:12,090 --> 00:06:09,729 this assembly of gse drawers and 131 00:06:13,830 --> 00:06:12,100 consoles some of which are already being 132 00:06:17,790 --> 00:06:13,840 installed at the Marshall setters 133 00:06:20,700 --> 00:06:17,800 Mississippi test facility qualification 134 00:06:22,890 --> 00:06:20,710 testing of various s2 components such as 135 00:06:24,689 --> 00:06:22,900 this umbilical disconnect system at the 136 00:06:27,120 --> 00:06:24,699 downey facility was in progress 137 00:06:37,370 --> 00:06:27,130 throughout the quarter disconnection 138 00:06:43,050 --> 00:06:40,620 factory checkout of the first s4b flight 139 00:06:44,969 --> 00:06:43,060 stage was concluded in january by the 140 00:06:46,469 --> 00:06:44,979 Douglas Aircraft Company at its Space 141 00:06:48,960 --> 00:06:46,479 Systems Center at Huntington Beach 142 00:06:51,360 --> 00:06:48,970 California the stage will be shipped to 143 00:06:54,980 --> 00:06:51,370 Douglas a Sacramento test facility early 144 00:06:57,360 --> 00:06:54,990 next quarter for acceptance firing tests 145 00:06:59,490 --> 00:06:57,370 structural work including installation 146 00:07:02,210 --> 00:06:59,500 of skirt components continued on the 147 00:07:05,100 --> 00:07:02,220 second flight stage early this quarter 148 00:07:06,060 --> 00:07:05,110 stage joining operations were completed 149 00:07:09,320 --> 00:07:06,070 in mid-february 150 00:07:12,150 --> 00:07:09,330 and factory checkout is now underway 151 00:07:14,909 --> 00:07:12,160 during hydrostatic testing of the third 152 00:07:17,490 --> 00:07:14,919 flight stage on February 24th the LOX 153 00:07:19,500 --> 00:07:17,500 tank failed although at a pressure far 154 00:07:22,529 --> 00:07:19,510 above that normally expected during 155 00:07:24,689 --> 00:07:22,539 flight preliminary assessment indicated 156 00:07:27,719 --> 00:07:24,699 the problem to be in the area of an 157 00:07:32,070 --> 00:07:27,729 excessive well to repair program impact 158 00:07:34,439 --> 00:07:32,080 if any is being investigated the s4b 159 00:07:36,750 --> 00:07:34,449 stage simulator was delivered to sacto 160 00:07:38,610 --> 00:07:36,760 in december and installed in the newly 161 00:07:40,350 --> 00:07:38,620 completed vehicle checkout lab for 162 00:07:43,409 --> 00:07:40,360 continuity tests in conjunction with 163 00:07:47,159 --> 00:07:43,419 automatic GRC completion of tests is 164 00:07:49,500 --> 00:07:47,169 expected early next quarter structural 165 00:07:51,689 --> 00:07:49,510 testing of the s4 be common bulkhead 166 00:07:54,779 --> 00:07:51,699 test specimen under cryogenic conditions 167 00:07:57,200 --> 00:07:54,789 began at sacto in december and seven 168 00:07:59,490 --> 00:07:57,210 tests were successfully conducted 169 00:08:02,279 --> 00:07:59,500 although the specimen finally failed 170 00:08:04,230 --> 00:08:02,289 during the test on January 13th data 171 00:08:07,950 --> 00:08:04,240 from the prior tests indicated no 172 00:08:10,230 --> 00:08:07,960 problem with flight stages at SAC those 173 00:08:13,230 --> 00:08:10,240 gamma complex static testing of a 174 00:08:15,629 --> 00:08:13,240 prototype model of the Saturn 5s for B 175 00:08:17,860 --> 00:08:15,639 auxiliary propulsion system was 176 00:08:21,470 --> 00:08:17,870 conducted during the quarter 177 00:08:23,690 --> 00:08:21,480 the widespread s4b qualification testing 178 00:08:25,610 --> 00:08:23,700 program is proceeding unscheduled with 179 00:08:27,680 --> 00:08:25,620 items such as vibration tests of 180 00:08:30,610 --> 00:08:27,690 retrorockets at the Thiokol chemical 181 00:08:33,110 --> 00:08:30,620 corporations why such division in Utah 182 00:08:35,719 --> 00:08:33,120 vibration thermal shock and functional 183 00:08:38,120 --> 00:08:35,729 testing of the s4 B's main fuel feed 184 00:08:41,690 --> 00:08:38,130 duct at Douglass's Santa Monica facility 185 00:08:44,270 --> 00:08:41,700 and testing of the s4 B oxidizer duct 186 00:08:58,190 --> 00:08:44,280 assembly at Wiley labs in El Segundo 187 00:09:01,190 --> 00:08:58,200 California assembly and delivery of the 188 00:09:03,860 --> 00:09:01,200 f1 engine for the third s1c flight stage 189 00:09:06,350 --> 00:09:03,870 the initial manned configuration stage 190 00:09:08,630 --> 00:09:06,360 were completed by Rocketdyne during the 191 00:09:11,510 --> 00:09:08,640 quarter one of the major components is 192 00:09:13,880 --> 00:09:11,520 this mark 10 turbo pump shown here in 193 00:09:16,430 --> 00:09:13,890 early build up stage with the main shaft 194 00:09:19,820 --> 00:09:16,440 in an assembly jig at rocky tines Canoga 195 00:09:22,070 --> 00:09:19,830 Park California plant in a later 196 00:09:24,500 --> 00:09:22,080 Assembly stage the fuel pollutes are in 197 00:09:26,420 --> 00:09:24,510 place this is how the pump looks prior 198 00:09:30,320 --> 00:09:26,430 to buildup of the turbine section and 199 00:09:32,960 --> 00:09:30,330 LOX pump in its final stage the pumps 200 00:09:36,440 --> 00:09:32,970 secondary lock seal locks volute and 201 00:09:39,140 --> 00:09:36,450 turbine manifold are all installed after 202 00:09:41,510 --> 00:09:39,150 a final inspection the pump is taken to 203 00:09:43,460 --> 00:09:41,520 the Santa Susana site for testing the 204 00:09:47,240 --> 00:09:43,470 large flame at the top of the stand is 205 00:09:49,760 --> 00:09:47,250 the afterburn this instrumentation film 206 00:09:53,780 --> 00:09:49,770 shows an f1 engine turbo pump during a 207 00:09:56,000 --> 00:09:53,790 hot fire testing at Santa Susana in the 208 00:09:57,860 --> 00:09:56,010 developmental area Rocketdyne has been 209 00:09:59,570 --> 00:09:57,870 contracted by NASA to develop an 210 00:10:02,090 --> 00:09:59,580 instrumentation system for measuring 211 00:10:05,240 --> 00:10:02,100 radiative heat from the exhaust plume of 212 00:10:08,390 --> 00:10:05,250 an f1 engine and to perform an analysis 213 00:10:10,880 --> 00:10:08,400 of exhaust plume radiation processes the 214 00:10:13,090 --> 00:10:10,890 study will assess the role of carbon as 215 00:10:15,710 --> 00:10:13,100 a thermal radiator and the geometry 216 00:10:22,270 --> 00:10:15,720 location and progress of afterburning 217 00:10:27,830 --> 00:10:25,700 the j2 engine qualification test series 218 00:10:30,470 --> 00:10:27,840 was completed by Rocketdyne on December 219 00:10:33,470 --> 00:10:30,480 22nd the series conducted at Santa 220 00:10:35,450 --> 00:10:33,480 Susana served to man rate the j2 the 221 00:10:39,680 --> 00:10:35,460 engine was fired 30 times for an 222 00:10:42,470 --> 00:10:39,690 accumulated duration of 3750 seconds in 223 00:10:44,900 --> 00:10:42,480 early January j2 qualification service 224 00:10:47,630 --> 00:10:44,910 life tests were conducted with seven 225 00:10:51,680 --> 00:10:47,640 successive full duration 500 second 226 00:10:53,450 --> 00:10:51,690 firings also at Santa Susana a study was 227 00:10:55,880 --> 00:10:53,460 performed to provide data on the 228 00:10:58,220 --> 00:10:55,890 movement of locks during a firing in 229 00:11:00,160 --> 00:10:58,230 sequence the film shows introduction of 230 00:11:02,450 --> 00:11:00,170 helium to sub cool the propellant 231 00:11:05,090 --> 00:11:02,460 pressurization of the run tank with 232 00:11:09,650 --> 00:11:05,100 gaseous nitrogen and depletion of the 233 00:11:11,360 --> 00:11:09,660 tank during firing a series of vibration 234 00:11:14,330 --> 00:11:11,370 test was conducted at rocky Dean's 235 00:11:17,360 --> 00:11:14,340 Canoga Park plant subjecting the j2 to 236 00:11:20,210 --> 00:11:17,370 simulated loads of the s1c stage boost 237 00:11:22,310 --> 00:11:20,220 phase the tests simulated those flight 238 00:11:25,990 --> 00:11:22,320 loads expected at booster ignition 239 00:11:28,160 --> 00:11:26,000 liftoff maximum aerodynamic load Mach 1 240 00:11:31,250 --> 00:11:28,170 aerodynamic gusts and steady-state 241 00:11:33,680 --> 00:11:31,260 flight no discrepancies were noted 242 00:11:36,079 --> 00:11:33,690 following an electromechanical check out 243 00:11:38,390 --> 00:11:36,089 the vibration test engine was installed 244 00:11:42,470 --> 00:11:38,400 in a test stand and fired for a full 245 00:11:44,900 --> 00:11:42,480 duration a new facility an electrical 246 00:11:46,910 --> 00:11:44,910 assembly cleanroom production line has 247 00:11:49,880 --> 00:11:46,920 been placed in operation at rocky Dean's 248 00:11:51,770 --> 00:11:49,890 Canoga Park plant the facility is used 249 00:11:55,329 --> 00:11:51,780 in the buildup of electrical control 250 00:11:58,310 --> 00:11:55,339 assemblies for the j2 engine system a 251 00:11:59,810 --> 00:11:58,320 total of seven j2 engines was delivered 252 00:12:03,200 --> 00:11:59,820 by rocky during this quarter to the 253 00:12:07,040 --> 00:12:03,210 Saturn 5 stage users including 3 for the 254 00:12:09,890 --> 00:12:07,050 third s to flight stage 2 s2 spares 1s 255 00:12:11,570 --> 00:12:09,900 for B spare and one for testing at the 256 00:12:12,920 --> 00:12:11,580 Air Force's Arnold engineering 257 00:12:17,300 --> 00:12:12,930 Development Center in Tullahoma 258 00:12:19,400 --> 00:12:17,310 Tennessee a douglas s4 b battleship 259 00:12:21,290 --> 00:12:19,410 stage which will be used for tankage in 260 00:12:24,590 --> 00:12:21,300 the tests was delivered to tella home on 261 00:12:26,570 --> 00:12:24,600 January 22nd following installation in 262 00:12:29,180 --> 00:12:26,580 the test cell and mounting of the j2 263 00:12:31,699 --> 00:12:29,190 engine next quarter firing tests will 264 00:12:33,740 --> 00:12:31,709 begin in July for verification of start 265 00:12:41,680 --> 00:12:33,750 restart and engine performance at 266 00:12:46,490 --> 00:12:44,690 the flight systems instrument unit was 267 00:12:48,380 --> 00:12:46,500 completed on December 6th at the 268 00:12:50,540 --> 00:12:48,390 Marshall Center and was moved into the 269 00:12:54,350 --> 00:12:50,550 quality and reliability of surance lab 270 00:12:56,269 --> 00:12:54,360 for checkout in mid-february a final 271 00:12:58,670 --> 00:12:56,279 checkout operations were completed under 272 00:13:00,440 --> 00:12:58,680 unit together with the three IBM check 273 00:13:02,870 --> 00:13:00,450 out trailers housing equipment for 274 00:13:05,449 --> 00:13:02,880 telemetry radio frequency and digital 275 00:13:07,490 --> 00:13:05,459 data acquisition systems check out the 276 00:13:09,530 --> 00:13:07,500 IU and check out equipment are being 277 00:13:11,900 --> 00:13:09,540 moved to Douglas aircrafts Huntington 278 00:13:13,610 --> 00:13:11,910 Beach facility where functional tests 279 00:13:16,130 --> 00:13:13,620 will begin next quarter in an 280 00:13:20,269 --> 00:13:16,140 environmental chamber simulating orbital 281 00:13:22,550 --> 00:13:20,279 thermal vacuum conditions the vibration 282 00:13:24,500 --> 00:13:22,560 test IU was emplaced in a fixture for 283 00:13:26,630 --> 00:13:24,510 mechanical vibration testing at Wiley 284 00:13:28,730 --> 00:13:26,640 labs Huntsville facility in December 285 00:13:31,069 --> 00:13:28,740 following successful completion of 286 00:13:32,870 --> 00:13:31,079 acoustic tests last quarter the 287 00:13:37,340 --> 00:13:32,880 mechanical program was successfully 288 00:13:39,019 --> 00:13:37,350 concluded by Wiley on January 20th after 289 00:13:40,460 --> 00:13:39,029 Marshall had updated the facilities 290 00:13:43,189 --> 00:13:40,470 checkout I you to the flight 291 00:13:45,410 --> 00:13:43,199 configuration it was shipped to KSC on 292 00:13:50,150 --> 00:13:45,420 February 28th for use in checking out 293 00:13:52,220 --> 00:13:50,160 launch complex 39 structural testing of 294 00:13:55,069 --> 00:13:52,230 the second structural test I you began 295 00:13:57,650 --> 00:13:55,079 December 30th at Marshall after a series 296 00:14:00,470 --> 00:13:57,660 of successful tests the unit crumpled on 297 00:14:03,620 --> 00:14:00,480 February 2nd at 140 percent of maximum 298 00:14:07,490 --> 00:14:03,630 aerodynamic load the exact safety factor 299 00:14:10,069 --> 00:14:07,500 for man rating two more tests had been 300 00:14:12,530 --> 00:14:10,079 planned the IU has now been broken down 301 00:14:15,410 --> 00:14:12,540 into sections for posts test examination 302 00:14:16,819 --> 00:14:15,420 and an evaluation of all tests data is 303 00:14:19,009 --> 00:14:16,829 underway to determine if additional 304 00:14:22,730 --> 00:14:19,019 testing using a new unit will be 305 00:14:24,560 --> 00:14:22,740 required installation of components in 306 00:14:26,810 --> 00:14:24,570 the first and second flight instrument 307 00:14:28,730 --> 00:14:26,820 units got underway this quarter at IBM 308 00:14:30,920 --> 00:14:28,740 Huntsville completion of installation 309 00:14:34,120 --> 00:14:30,930 and start of check out of the first 310 00:14:36,889 --> 00:14:34,130 flight I you are scheduled for mid-may 311 00:14:39,319 --> 00:14:36,899 build-up of IBM's checkout capability 312 00:14:41,660 --> 00:14:39,329 continue during the report period in the 313 00:14:44,210 --> 00:14:41,670 area of component test equipment this 314 00:14:47,269 --> 00:14:44,220 new turn tilt test stand was added in 315 00:14:49,460 --> 00:14:47,279 January for use in checking out the st1 316 00:14:51,890 --> 00:14:49,470 24 M inertial platforms 317 00:14:56,780 --> 00:14:51,900 Subsystem before installation in the eye 318 00:15:00,050 --> 00:14:56,790 you also IBM's new aerospace system test 319 00:15:01,850 --> 00:15:00,060 & Evaluation console known as aztec was 320 00:15:04,490 --> 00:15:01,860 being checked out this quarter and will 321 00:15:06,680 --> 00:15:04,500 be operational in april the previous 322 00:15:07,430 --> 00:15:06,690 aztec unit has been incorporated into 323 00:15:11,330 --> 00:15:07,440 IBM's 324 00:15:12,950 --> 00:15:11,340 simulation laboratory for use in 325 00:15:15,590 --> 00:15:12,960 checkout of the fully assembled 326 00:15:18,350 --> 00:15:15,600 aiyoo the Saturn 5 central control room 327 00:15:22,790 --> 00:15:18,360 now under construction by IBM will be 328 00:15:24,710 --> 00:15:22,800 operational in May I BMS instrumentation 329 00:15:26,870 --> 00:15:24,720 and communication acceptance complex 330 00:15:29,720 --> 00:15:26,880 which ties in to the central control 331 00:15:31,880 --> 00:15:29,730 room was completed in January it has the 332 00:15:41,540 --> 00:15:31,890 capability of testing various telemetry 333 00:15:43,850 --> 00:15:41,550 components at Marshall Saturn five GSE 334 00:15:45,800 --> 00:15:43,860 test facility umbilical disconnects 335 00:15:47,540 --> 00:15:45,810 testing began this quarter on the swing 336 00:15:50,710 --> 00:15:47,550 arms which will be used on the mobile 337 00:15:53,480 --> 00:15:50,720 launcher at KSC s launch complex 39 338 00:15:56,660 --> 00:15:53,490 airplane engines generated winds up to 339 00:15:59,000 --> 00:15:56,670 75 miles per hour to simulate wind loads 340 00:16:01,940 --> 00:15:59,010 which might puppet a Saturn 5 vehicle on 341 00:16:04,280 --> 00:16:01,950 its head in Florida the swing arms which 342 00:16:06,200 --> 00:16:04,290 provide for personnel access propellant 343 00:16:09,050 --> 00:16:06,210 loading and electrical and pneumatic 344 00:16:12,470 --> 00:16:09,060 connections will be shipped to KSC upon 345 00:16:14,510 --> 00:16:12,480 completion of testing build-up of 346 00:16:17,060 --> 00:16:14,520 marshall saturn v systems development 347 00:16:19,460 --> 00:16:17,070 facility is continuing with installation 348 00:16:21,740 --> 00:16:19,470 of the f1 engine this quarter the 349 00:16:24,350 --> 00:16:21,750 facility is a breadboard or simulation 350 00:16:27,380 --> 00:16:24,360 of launch vehicle automatic checkout GSE 351 00:16:29,600 --> 00:16:27,390 at launch complex 39 plus components 352 00:16:32,540 --> 00:16:29,610 simulating a completely assembled Saturn 353 00:16:34,760 --> 00:16:32,550 5 vehicle purpose of the facility is to 354 00:16:37,940 --> 00:16:34,770 verify compatibility between the Saturn 355 00:16:40,520 --> 00:16:37,950 5 and launch vehicle GS II and also to 356 00:16:44,420 --> 00:16:40,530 develop and verify checkout tapes which 357 00:16:45,950 --> 00:16:44,430 will be used for actual launchings the 358 00:16:47,960 --> 00:16:45,960 breadboard instrument unit was also 359 00:16:50,390 --> 00:16:47,970 delivered to the breadboard facility 360 00:16:52,760 --> 00:16:50,400 during the report period prior to the 361 00:16:56,870 --> 00:16:52,770 Saturn 5 program and the launch vehicle 362 00:16:59,480 --> 00:16:56,880 GSE concept stage peculiar GSE that is 363 00:17:01,460 --> 00:16:59,490 designed for individual stages only had 364 00:17:04,279 --> 00:17:01,470 to be used at the Cape for checkout of 365 00:17:06,360 --> 00:17:04,289 the fully assembled vehicle 366 00:17:08,189 --> 00:17:06,370 installation of electrical support 367 00:17:09,840 --> 00:17:08,199 equipment at the Saturn 5 breadboard 368 00:17:19,260 --> 00:17:09,850 facility continued throughout the 369 00:17:21,600 --> 00:17:19,270 quarter at Marshall Saturn five dynamic 370 00:17:23,970 --> 00:17:21,610 test stand installation of the Saturn 5 371 00:17:26,850 --> 00:17:23,980 dynamic test vehicles first stage was 372 00:17:28,710 --> 00:17:26,860 accomplished on January 14th testing of 373 00:17:30,570 --> 00:17:28,720 the stage to determine vibration and 374 00:17:33,120 --> 00:17:30,580 bending characteristics during flight 375 00:17:35,549 --> 00:17:33,130 we'll begin this summer later the two 376 00:17:37,770 --> 00:17:35,559 upper stages I you and dummy Apollo 377 00:17:41,250 --> 00:17:37,780 spacecraft will be headed for full-scale 378 00:17:43,500 --> 00:17:41,260 testing meanwhile prior to start of 379 00:17:45,330 --> 00:17:43,510 dynamic testing checkout is underway of 380 00:17:47,640 --> 00:17:45,340 the hydraulic support system on which 381 00:17:49,409 --> 00:17:47,650 the booster rests in the stand the 382 00:17:53,130 --> 00:17:49,419 system was built and installed by the 383 00:17:55,169 --> 00:17:53,140 Martin company of Baltimore at Marshalls 384 00:17:57,360 --> 00:17:55,179 Mississippi test facility preparations 385 00:18:00,659 --> 00:17:57,370 are continuing to ready the first s two 386 00:18:03,799 --> 00:18:00,669 static test stand designated a 2 for the 387 00:18:06,360 --> 00:18:03,809 initial s2 firing scheduled next quarter 388 00:18:08,310 --> 00:18:06,370 modifications of the s2 all systems 389 00:18:11,750 --> 00:18:08,320 stage which was installed in the stand 390 00:18:14,669 --> 00:18:11,760 last quarter are also continuing 391 00:18:17,100 --> 00:18:14,679 construction of the second s to stand 392 00:18:21,570 --> 00:18:17,110 designated a1 is progressing steadily 393 00:18:24,090 --> 00:18:21,580 understand is 58 percent complete at the 394 00:18:26,039 --> 00:18:24,100 door position s1 see static test stand 395 00:18:28,789 --> 00:18:26,049 concrete work in direction of Steel 396 00:18:31,830 --> 00:18:28,799 continued throughout the report period 397 00:18:33,270 --> 00:18:31,840 the test control centers for both areas 398 00:18:35,580 --> 00:18:33,280 have been finished except for 399 00:18:38,810 --> 00:18:35,590 installation of equipment the data 400 00:18:41,600 --> 00:18:38,820 acquisition facility is now operational 401 00:18:45,779 --> 00:18:41,610 in summary the period of December 1st 402 00:18:47,399 --> 00:18:45,789 1965 through February 28 1966 witnessed 403 00:18:49,380 --> 00:18:47,409 to the achievement of significant 404 00:18:51,630 --> 00:18:49,390 program milestones including the 405 00:18:55,500 --> 00:18:51,640 successful acceptance static firing of 406 00:18:58,080 --> 00:18:55,510 the first s 1c flight stage shipment of 407 00:19:01,919 --> 00:18:58,090 the s 1 C and s two facilities checkout 408 00:19:04,350 --> 00:19:01,929 stages to KSC the first cluster firing 409 00:19:06,440 --> 00:19:04,360 of the s2 battleship stage using flight 410 00:19:09,720 --> 00:19:06,450 configuration j2 engines 411 00:19:12,930 --> 00:19:09,730 factory checkout of the first s4v flight 412 00:19:15,360 --> 00:19:12,940 stage completion of the j2 engine 413 00:19:17,580 --> 00:19:15,370 qualification test series 414 00:19:21,450 --> 00:19:17,590 successful instrument unit vibration 415 00:19:24,140 --> 00:19:21,460 tests testing of GIC items such as the 416 00:19:27,030 --> 00:19:24,150 mobile launcher swing arms and 417 00:19:29,980 --> 00:19:27,040 preparation for the initial S - static